Eungella Dam Access

Customer: Sun Water

In order enable safe access to the rising main thrust block / flexible bend and pontoon anchorage Pad on the Eungella Dam, Uptime fabricated and installed access stairs to both structures. Suitable handrails were also installed to the surge tank structure.

kampungbet kampungbet kampungbet kampungbet