Customer: Port of Melbourne
The work involved supply and install of a packaged Xylem Pump Station including the new pump and control systems, installing the existing flowrate into the new pit, design and install shoring during the works. Progressively connecting the eight inlet lines from the existing pump pit. Demolition, remove and backfill the old existing pit.