Cowwarr Offtake Works Slip Meters

Customer: Southern Rural Water

Installation of the 2 slipmeters at the Cowwarr Offtake included the Design & Supply of 1 temporary bulkhead to isolate the offtake channel. Demolition and removal of part of cover slab on pits and removal of existing gate and equipment. Fabrication and installation of 2 x marine grade aluminium bulkheads. Installation of Slipmeters into pit viz 2 x 1200. Fabrication and Installation of a new access platform with relocation of existing steps and modifications to control building.