Eungella Dam Access

Customer: Sun Water

In order enable safe access to the rising main thrust block / flexible bend and pontoon anchorage Pad on the Eungella Dam, Uptime fabricated and installed access stairs to both structures. Suitable handrails were also installed to the surge tank structure.