Glenmaggie Dam Auxiliary Valve

Customer: Southern Rural Water

Fabrication and Installation of an Auxiliary Valve system at Glenmaggie dam, to allow Southern Rural Water finer control of the irrigation water flow. Uptime manufactured all the access platforms, walkways, stainless steel pipe work in the workshop and then installed at site.

This project presented many civil excavation and access challenges in the preparation of deep pour foundations alongside existing operational infrastructure. Uptime also managed the civil and electrical contractors delivering the project on time and within budget.