Mildura Water Treatment Plant Water Tight Door

Customer: Lower Murray Water

To improve operator safe access, a new water-tight submarine door was designed and installed at ground level into the existing water treatment Clarifier side wall.

Woady Yaloak Diversion Scheme

Customer: Corangamite Catchment Management Authority

Decommissioning of redundant penstock gates. Design, manufacture and installation of new penstock gates as required replacing the decommissioned gates.

Elphinstone Trash Grates

Customer: Coliban Water

Design, manufacture and installation of automated hydraulic trash grate system for the purpose of hydraulically lifting flotsam debris out of the water transmission channel.

Raw Water Treatment Plant Upgrade

Customer: Lower Murray Water

Fabrication and construction of a new stainless steel Flow Splitter Box and above ground DN750 Rising Main together with associated outlet pipe work and valves for the upgrade of the raw water treatment process at the Mildura 7th St treatment plant.

Glenmaggie Dam Auxiliary Valve

Customer: Southern Rural Water

Fabrication and Installation of an Auxiliary Valve system at Glenmaggie dam, to allow Southern Rural Water finer control of the irrigation water flow.

Eungella Dam Access

Customer: Sun Water

In order enable safe access to the rising main thrust block / flexible bend and pontoon anchorage Pad on the Eungella Dam.

Collinsville Low Lift Pump Station

Customer: Sun Water

The pump station consists of a reinforced concrete dry well approximately 8.0 metres in diameter and 30.0 metres in height. The pump station is subjected to the regular flooding of the Bowen River.

Manor Lakes Storage Tank

Customer: City West Water

The work involved the decommissioning and removal of an unused elevated water storage tower at Manor Lakes. All infrastructure was dismantled and removed, included the storage tank and tower, concrete footings and electrical control systems.

Network Integration and Ancillary Works

Customer: Leed / John Holland JV

Fabrication of MSCL pipe fittings from 100mm Diameter up to 1m Diameter for Adelaide water infrastructure upgrade. Fittings included manifolds, tees, bends and dismantling joints.

Anchor Testing Access

Customer: Southern Rural Water

Fabrication and Installation of walkways and testing trolley to provide access to various anchor head locations at Southern Rural Water’s Glenmaggie Dam

Waste Water Pump Station Upgrade

Customer: Central Highland Water

The wastewater pumping station required upgrading to meet current and future flow requirements. This included a wide range of flows with significant delivery heads at peak flow conditions.

Hart St Pump Station

Customer: City of Port Adelaide Enfield

The project consisted of the demolition of an old overhead gantry and flooring over the top of a pump station pit.

Cowwarr Offtake Works Slip Meters

Customer: Southern Rural Water

Installation of the 2 slipmeters at the Cowwarr Offtake included the Design & Supply of 1 temporary bulkhead to isolate the offtake channel. Demolition and removal of part of cover slab on pits and removal of existing gate and equipment.

Melton Reservoir Outlet Replacement

Customer: Southern Rural Water

Replacement of the existing DN700 Ductile Iron main outlet conduit at Melton reservoir Vic with a new DN900 Mild Steel Cement Lined (MSCL) outlet conduit, as the existing conduit had exceed its design life.

Water Storage Tank Access Upgrades

Customer: SA Water

The varied standards of ladders, working platforms, guard railings and hatches on SA Water Above Ground tanks were an unacceptable risk to SA Water staff.

Rotocure Aligner

Customer: Fenner Dunlop

Design, fabrication and installation of 2 Rotocure Roll Aligners. The large rubber conveyor belt roll was being manually lined up with the Rotocure using the overhead crane and Portapower hydraulic jacks.

Cowwarr Regulator

Customer: Southern Rural Water

Fabrication and Installation of new Weir Structure access Staircase for Cowwarr Weir. Fabrication and Installation of new weir structure gantry crane maintenance access stairs and platforms.

Barwon Heads Sewerage Pump Station Upgrade

Customer: Barwon Water Alliance

Uptime Services were engaged by Barwon Water Alliance to upgrade the existing Barwon Heads Sewage Pump Station # 1. The upgrade works included construction of a new concrete valve pit and slab lid over the existing well.

Appleton dock Sewage Pump Station

Customer: Port of Melbourne

The work involved supply and install of a packaged Xylem Pump Station including the new pump and control systems, installing the existing flowrate into the new pit, design and install shoring during the works.

Regulator Side Panels

Customer: Murray Irrigation

Fabrication, paint, delivery, installation and adjustment of new side panels and removal of existing side panels at various regulators over a 4-year period on the Mulwala canal.

Valve Access Platforms

Customer: SA Water

Design, Manufacture and installation of access walkways, stairs and ladders for valve chambers located at SA Water pumping stations.

Ship Unloader Boom

Customer: Alcoa

Design, Fabrication and Installation on a ship unloader boom for Alcoa. The ship unloader boom is used to unload Bauxite from the transport ship for the Port Henry Aluminium Smelter.